A pitot tube is a small transparent open tube bent at right angle. The basic purpose is to measure the flow i.e. Velocity of the fluid. The point where the velocity of the fluid is zero is known as stagnation point. The pressure at that point is known as stagnation pressure. p + 1/2 ρ v2 + γ h = constant along a streamline         (1) where p = static pressure (relative...

Sunday, 4 May 2014

Duties of Lubrication Personnel

 Following are duties of Lubrication Personnel Use correct lubricants in every case and as few types as possible for the plant as a whole. Apply lubricants properly. Apply the correct amount of lubricant. Apply lubricants at proper intervals. Develop schedules for items 1 to 4 for each machine, distribute or post them, and see that they are followed. Train and instruct the oilers, and arrange for lubrication clinics if the number of oilers warrants. Suppliers’ sales and engineering representatives frequently can render valuable assistance...

Planning Outages

Most companies, as part of their annual business plan, develop an outage schedule that is based on anticipated business cycle or perceived maintenance requirements. This outage schedule contains all shutdown dates for critical production systems. Unfortunately, most of these plans do not consider the impact on capacity. An effective outage schedule should be configured to minimize loss of production capacity, product quality and the potential increase in overall operating cost that can result from poorly coordinated outage schedules. Care should...

Thursday, 1 May 2014

How Pistons are Made

...

Tuesday, 8 April 2014

Fused Deposition Modelling

...

Sunday, 16 March 2014

Planning Outages

Most companies, as part of their annual business plan, develop an outage schedule that is based on anticipated business cycle or perceived maintenance requirements. This outage schedule contains all shut down dates for critical production systems. Unfortunately, most of these plans do not consider the impact on capacity. An effective outage schedule should be configured to minimise loss of production capacity, product quality and the potential increase in overall operating cost that can result from poorly coordinated outage...

Wednesday, 5 February 2014

Solution Manual of Modern Manufacturing by Groover

Solution Manual : of Fundamentals of Modern Manufacturing by Groover Click on the link below for manufacturing solution manual http://www.4shared.com/office/xMss4XtCce/Manufacturing_Solution_manual.html  ...

Applied Thermodynamics By McConkey

Applied Thermodynamics  By McConkey 140828329-Applied-Thermodynamics-and-Engineering-by-T-D-Eastop-and-a-McConkey.pd...

Thursday, 30 January 2014

Pro Engineer Installation Steps

For Pro E installation follow the following steps  Start pro/e setup  Open license.dat with any  txt-editor and replace every occurance of 00-00-00-00-00-00 with your computer real HOST_D (same one shown in the bottom left corner of the Pro/e setup). Save the license.dat Save that edited license.dat file , don't replace, remove or delete that file.   Install proe - proe_mech -ptc_distributed_services (optional). On license-config screen select "nodelocked license" and point to edited license.dat Next  apply a patches...